In general, the Concrete Pump Pipe on the site is laid underground because it saves space on the ground and prevents people from stepping on the ground, causing damage to the Concrete Pump Pipe. The first step is to carry out the construction of the foundation. Because it is under the ground, it needs to be dredged.
When digging a ditch with Concrete Pump Pipe , pay attention to whether or not laying wires or other Concrete Pump Pipes before underground, and pay attention to protect some facilities that existed before. The construction of the Concrete Pump Pipe can begin when the foundation is well established. There are also many things to pay attention to during the laying process. Even if buried underground, it is necessary to install a fixed shelf.